Programming and commissioning

Controller programming and commissioning after installation, modernization or equipment replacement. PLC configuration and verification of signals, control algorithms, sensors and actuators take account of compatibility, the original program and authorized access.

Programmable controller

When this service is needed

  • Equipment is installed but automatic operation is unavailable.
  • A controller has been replaced or software must be adapted to new sensors and actuators.
  • A system works independently of linked equipment or does not execute agreed scenarios.
  • A property must be prepared for handover and checked in normal and transitional operating modes.

Scope of work

The exact scope is agreed after reviewing equipment, documentation and access.

Initial configuration

Review hardware and software versions, design algorithms, authorized access and existing backups.

Inputs and outputs

Match signals to channel assignments and check indication, feedback and commands.

Algorithms

Adapt agreed sequences, setpoints, delays, schedules and control priorities.

Equipment communication

Check exchange parameters, addressing and device availability over supported protocols.

Functional testing

Agree a safe test program for normal, transitional and alarm modes while retaining protective functions.

Configuration handover

Record changes, software versions and available backups within the agreed scope.

Work sequence

Initial brief

Review symptoms, equipment, documentation and desired functions.

Engineering assessment

Agree the scope, access and safe conditions for work.

Implementation

Perform agreed work and record any changes.

Verification

Check agreed functions and hand over findings and settings.

What the client receives

A working configuration for the agreed functions, a record of tests completed, findings and limitations. If necessary, a separate plan is prepared to address installation or design discrepancies.

Questions before work begins

Can an unfamiliar controller be configured?

We first identify the model, supported software, documentation and authorized access.

Will the previous program be retained?

Where technically accessible, a backup is made before settings are changed.

Does commissioning include correcting electrical installation faults?

Installation defects are recorded and their correction is agreed separately.

Can commissioning be phased?

Yes, if the design allows the system to be safely divided into functional sections.

What determines the cost of automation commissioning?

The controller and equipment configuration, number of signals, control logic complexity, documentation and access to the original program. The scope is determined in advance.