VOLTSVERDEAudit · Automation · Electrical

Backup and off-grid power

Backup and off-grid power for homes and other properties: generator connections, automatic transfer switches (ATS), UPS systems, inverters and batteries. Solutions are selected according to loads, with checks of correct changeover when the mains fails.

Sound-enclosed diesel generator

When this service is needed

  • Utility outages stop critical engineering systems in a residence.
  • A generator starts but automatic power changeover does not operate correctly.
  • A UPS or inverter does not provide expected runtime.
  • Off-grid power in a country property, boat or other specialized property needs assessment.

Scope of work

The exact scope is agreed after reviewing equipment, documentation and access.

Load assessment

Identify critical loads, running and starting loads and required backup runtime.

Generator systems

Coordinate capacity, location, ventilation, maintenance and specified generator connection arrangement.

UPS and batteries

Check source compatibility, battery condition, charging modes and calculated runtime.

Inverters and solar installations

Assess configuration, equipment limitations, operating conditions and available control parameters.

Source changeover

Check designed transfer logic, priorities and agreed interlocks that prevent impermissible connection of sources.

Testing and maintenance

Agree a safe program for load tests, transitional modes and restoration of normal supply.

Work sequence

Initial brief

Review symptoms, equipment, documentation and desired functions.

Engineering assessment

Agree the scope, access and safe conditions for work.

Implementation

Perform agreed work and record any changes.

Verification

Check agreed functions and hand over findings and settings.

What the client receives

A justified backup configuration or a list of required corrections to an existing system, agreed settings and test results. Actual backup runtime depends on load, battery capacity, equipment condition and operating conditions.

Questions before work begins

Can only selected circuits be backed up?

Yes, identifying critical loads often allows more efficient use of available capacity.

Can a generator connect to an existing board?

A survey establishes compatibility and necessary design solutions for safe source changeover.

Do you work on off-grid vessel systems?

Feasibility is agreed separately based on vessel type, equipment, documentation and special requirements.

Can the system be tested without shutting down all loads?

The test program is agreed with the owner; necessary interruptions and operating modes are established in advance.

How is the cost of connecting a generator and ATS determined?

Power rating, priority loads, the existing distribution design and compatibility of transfer devices are considered. The solution and cost are agreed after the survey.

Related services